
Cast Metal Letters Installation
Methods


Flush Stud
Mount Stud
Mount Installation Instructions
This is the typical installation method Cast
metal letters. There is no space between the
surface and the letter. 3/16"diameter studs
come out the back of each letter. Studs would
be set in drilled holes with silicone or other
adhesive cement. An installation pattern will
be required to ensure proper stud placement.

Projected
Jamb Nut Mount Stud
Mount Installation Instructions
Stainless steel jamb nuts are inserted between
the letter and the mounting surface on the studs.
This method is the same as flush stud mount,
but some space remains between the surface and
the letter. An installation pattern will be
required to ensure proper stud placement.

Spacer Mount
Stud
Mount Installation Instructions
Pre-cut spacers are inserted between the letter
and the mounting surface on the stud. Specify
by the amount of standoff required -- not by
spacer length. Follows the same method as the
flush stud mount. An installation pattern will
be required to ensure proper stud placement.

Corrugated
Nut Mount Stud
Mount Installation Instructions
The corrugated nut installation method
is used When you have access to the rear of
the wall, washers and nuts are used on both
sides of the corrugated surface of the wall,
on the studs.An installation pattern will be
required to ensure proper stud placement.

Flat
Metal Wall Mount Stud
Mount Installation Instructions
The flat metal wall mount method is used when
you are installing on a flat metal surface have
access to the rear of the wall. Washers and
nuts are used on both sides of the flat metal
wall surface, on the studs. An installation
pattern will be required to ensure proper stud
placement.
Double
Rail Installation
For the double rail installation, two rows
of 1/4"thick x 3/4"high aluminum bar
is secured to back of each letter with stainless
steel screws. Bar comes standard with baked
enamel paint finish. Only available on letters
4" to 24" high. The entire rail can
then be attached to the surface. Extra shipping
charges may apply due to rail.
Bottom Rail
Installation
For the bottom rail installation method, letters
are drilled and tapped from the bottom with
stainless steel studs going through aluminum
tubing. Tube is standard with black baked enamel
paint finish. Available on letters 4" to
24"high and 3/8" or thicker only.
$10.00 NET per letter. Ships unassembled. Extra
charges may apply due to rail.

Bottom Stud
Installation
For the bottom stud installation method, letters
are drilled and tapped from the bottom. You
would provide your own bar or channel for mounting.
Letters with round bottoms (i.e. O,S,G etc.)
will have a flattened base to receive studs.
Exterior applications greater than 6" letters
require tiebacks to hold against wind.
|