Impact Sign Letters and Logos
Our Products
Cut Metal Letters and Logos
Cast Metal Letters
Foam Letters and Logos
Plastic Letters and Logos
Changeable Letter Signs
Marquee Letter Signs
Vinyl Letters and Logos
Installation Mehthods
Get A Quote
Idea Gallery
Custom Logos
Frequently Asked Questions on Sign Letters
About Impact Sign Letters Contact Impact Sign Letters
Home > Installation Methods > Cast Metal Letters Installation Methods 9/10/2010

Cast Metal Letters Installation Methods


Flush Stud Mount

 

Flush Stud Mount Stud Mount Installation Instructions

This is the typical installation method Cast metal letters. There is no space between the surface and the letter. 3/16"diameter studs come out the back of each letter. Studs would be set in drilled holes with silicone or other adhesive cement. An installation pattern will be required to ensure proper stud placement.

 

Projected Jamb Nut

 

Projected Jamb Nut Mount  Stud Mount Installation Instructions

Stainless steel jamb nuts are inserted between the letter and the mounting surface on the studs. This method is the same as flush stud mount, but some space remains between the surface and the letter. An installation pattern will be required to ensure proper stud placement.

 

Spacer Mount

 

Spacer Mount   Stud Mount Installation Instructions

Pre-cut spacers are inserted between the letter and the mounting surface on the stud. Specify by the amount of standoff required -- not by spacer length. Follows the same method as the flush stud mount. An installation pattern will be required to ensure proper stud placement.

 

Corrugated Nut Mount

 

Corrugated Nut Mount   Stud Mount Installation Instructions

The corrugated nut   installation method is used When you have access to the rear of the wall, washers and nuts are used on both sides of the corrugated surface of the wall, on the studs.An installation pattern will be required to ensure proper stud placement.

 

Flat Metal Wall Mount

 

Flat Metal Wall Mount    Stud Mount Installation Instructions

The flat metal wall mount method is used when you are installing on a flat metal surface have access to the rear of the wall. Washers and nuts are used on both sides of the flat metal wall surface, on the studs. An installation pattern will be required to ensure proper stud placement.

 

 

Double Rail MountDouble Rail Installation

For the double rail installation, two rows of 1/4"thick x 3/4"high aluminum bar is secured to back of each letter with stainless steel screws. Bar comes standard with baked enamel paint finish. Only available on letters 4" to 24" high. The entire rail can then be attached to the surface. Extra shipping charges may apply due to rail.

 

Bottom Rail Installation

For the bottom rail installation method, letters are drilled and tapped from the bottom with stainless steel studs going through aluminum tubing. Tube is standard with black baked enamel paint finish. Available on letters 4" to 24"high and 3/8" or thicker only. $10.00 NET per letter. Ships unassembled. Extra charges may apply due to rail.

Bottom Stud Mount

Bottom Stud Installation

For the bottom stud installation method, letters are drilled and tapped from the bottom. You would provide your own bar or channel for mounting. Letters with round bottoms (i.e. O,S,G etc.) will have a flattened base to receive studs. Exterior applications greater than 6" letters require tiebacks to hold against wind.

Metal Letters | Brass Letters | Bronze Letters | Aluminum Letters | Stainless Steel Letters | Copper Letters | Plastic Letters | Foam Letters
Our Products | Installation Methods | Get A Quote | Idea Gallery | Custom Logos | FAQ | About Us | Contact | Home
The Power of Making a Strong Impression Need A Rush Order for Sign Letters? Get a quote on a sign letter products Free shipping on all orders over $100!
Copyright © 2010 Impact! Signs Letters | Site Map E-mail Us | 1.800.492.1201